Our customerHigh Tech Demolition
Principal contractorGlencar Construction
Site areaApprox. 40 acres
Product40 mm recycled aggregate
What the client needed
Concrete slabs, footings, foundations, drainage and below-ground obstructions removed from a former warehouse site of around 40 acres, leaving a safe, level brownfield platform ready for redevelopment.
What we did
A full site assessment came first to manage the risks. We broke out the slabs and foundations with breakers and pulverisers and fed the arisings straight into a crusher and screener, producing large quantities of 40 mm aggregate for the civil engineering contractor to reuse on the same site.
What we handed back
The ground levelled and left clean in brownfield condition, finished within the programme. Recycling the concrete on site cut the volume going to tip and the stone the next contractor needed to buy in.