BuildingTwo-storey former care home
SettingHousing and a main road
SurveysHazardous materials & bats
HandoverCleared brownfield plot
What the client needed
Full demolition of a two-storey former care home surrounded by houses and next to a main road. The neighbours, the road and the building’s own condition shaped every decision.
What we did
Hazardous materials and bat surveys came before anything was touched. A soft strip took out the fixtures, fittings and finishes, then the structure was taken down in a controlled sequence to avoid collapse and keep dust and debris to a minimum.
What we handed back
The building down safely and on programme, materials segregated for recycling, and the site handed back as a cleared brownfield plot ready for redevelopment.


Got a similar job?
Send the details or call 01527 304106 for a price.
